HV Workshop and Administration Building
Client
Qube
Build Time
8 Months
Location
Picton
Contract Type
AS4902 – Design and Construct
Value
$13M
QDC designed and constructed a two-level administration building within the operating bulk materials handling logistics park. The scope also includes the construction of a workshop for heavy vehicles (HV) which consists for 4 bays with services pits, overhead gantry cranes and a truck wash bay.