Newhaul Heavy Duty Workshop

Client Newhaul Pty Ltd Build Time 10 Months Location Geraldton, WA Contract Type AS4902 - Design and Construct

This multi-purpose 24/7 facility is primarily designed to accommodate truck servicing and maintenance, with an office space located adjacent to, and inside, the workshop for our staff.

The project has over 10,000 tons of crushed road base material and 15,000m2 of combined heavy & light duty hardstands. The facility covers 5,000m² of combined cutting-edge workshop areas with a modern office space.

The new workshop includes nine new servicing bays, featuring two custom-built servicing pits which are the focal point of the project. The first is a 33-metre-long trailer servicing pit, fabricated offsite and installed in four large sections. The second is a suspended service pit, built in-situ with tilt-up concrete panel walls and a concrete base, spanning 250m² and 2.7-metres-deep of custom servicing space.